First Horizon Bank
First Horizon Bank
Rooftop Antenna Relocation
800 South Gay Street | Knoxville, Tennessee

Four rooftop antenna frames and cable routes surrounding the penthouse. Permit drawing S-100, Revision 3.
Engineered antenna relocation to accommodate replacement of the four-sided penthouse sign.
1. PROJECT OVERVIEW
K2 Communications developed an engineered relocation solution for antennas mounted on the rooftop penthouse of the First Horizon Bank building. Replacement of the sign on all four faces of the penthouse required moving the antennas to independent supports on the main roof, with new cable routes and coordinated transitions for multiple communications users.
2. THE CHALLENGE
The penthouse supported a mix of microwave dishes, satellite antennas, panels, and omnidirectional antennas. Moving this equipment required more than clearing the sign contractor’s work area: the new arrangement had to address antenna orientation, structural support, cable lengths, grounding, roof protection, and maintenance access. Coordination with equipment owners was essential to plan service transitions around the building improvements.
3. STRUCTURAL SUPPORT AND ROOFTOP LAYOUT
The permit design placed four gravity-mounted steel antenna frames around the main roof, one in each sector surrounding the penthouse. The frames incorporated mounting pipes, horizontal rails, and diagonal bracing, with rubber mats beneath the steel bases to protect the roof. The antenna schedule identified equipment assignments, mounting elevations, and cable requirements for the proposed locations.
4. CABLE ROUTING AND ROOF ACCESS
Four rooftop cable-tray routes connected the penthouse to the new frames. Supported trays organized the cable runs, while steel step-overs maintained access across them. The design also required connection to the existing grounding system, with its condition checked and upgrades made as necessary.
5. K2 SCOPE AND COORDINATION
- Engineering coordination and signed, sealed permit drawings for the rooftop relocation.
- Removal and demolition work, followed by procurement and installation planning for the new frames, cable trays, and associated hardware.
- Antenna-owner coordination, replacement or extended cabling, and sequencing of equipment moves to the new supports.
- Comparison of a direct move to permanent locations with a temporary-then-permanent relocation approach.
- Project scheduling linking plan approval, permitting, material delivery, frame installation, equipment relocation, and permit closeout.
6. PROJECT VALUE
The engineered layout separated the antenna supports from the penthouse sign structure and established permanent equipment locations around the roof. It provided a coordinated basis for the sign replacement while addressing the structural, cabling, and access needs of a rooftop shared by multiple communications users.