ATSC 3.0 Over Fiber & Cat6
NBC New York
ATSC 3.0 Distribution over Fiber
30 Rockefeller Plaza, New York, NY
Testing at Alpine Tower, Alpine, NJ
K2 Communications tested ATSC 3.0 NextGen TV signal transport for NBC New York’s new production facility at 30 Rockefeller Plaza, then installed the fiber equipment and adjusted signal levels on site. Successful testing at Alpine Tower supported the equipment purchase and deployment, including 26 Zinwell set-top boxes installed by NBC.
Project challenge
NBC needed to carry off-air television signals from its rooftop reception system to the second floor and distribute them to monitors over shielded Cat6a cable. With anticipated cable runs reaching approximately 350 feet, the engineering task was to establish whether the complete signal path could preserve sufficient signal quality for reliable ATSC 3.0 decoding.
The proposed system used the building’s existing dark fiber for vertical transport, followed by Muxlab CATV distribution hubs and baluns for the final cable runs. K2 evaluated the RF signal through each stage, including the losses introduced by longer Cat6a runs.
Testing at Alpine Tower
K2 assembled a representative signal path using a Televes Ellipse Mix antenna mounted approximately 110 feet above ground on Alpine Tower, with about 150 feet of RG-6 coax feeding the test equipment. A Televes 238201 FiberKom transmitter and 238101 receiver were connected through a one-meter single-mode optical jumper. The receiver fed a Muxlab 16-port CATV hub, shielded Cat6a cable, a CATV balun and a Zinwell ZAT-600B decoder connected to a monitor by HDMI.
Using a Rover Tab 7 Ultra analyzer and the decoder’s reported readings, K2 measured signal levels and checked picture, sound and decoder lock at multiple cable lengths. Testing focused on UHF RF channel 32 at 581 MHz, carrying WNBC’s NextGen TV service, and included VHF RF channel 11 at 201 MHz. Measurements were recorded on December 17 and 27, 2024.
Testing established the deployment approach
The decoder remained locked on both tested channels through 386 feet of Cat6a. At that length, measured cable loss relative to a six-foot jumper was 60.0 dB on UHF channel 32 and 34.8 dB on VHF channel 11. A 750-foot UHF test did not maintain lock, establishing a practical limit within the tested configurations.
Measured performance at Alpine
| Cat6a length | Ch 32 cable loss | Ch 11 cable loss | Decoder lock |
| 256 ft | 40.1 dB | 22.9 dB | Both channels |
| 326 ft | 51.4 dB | 30.7 dB | Both channels |
| 386 ft | 60.0 dB | 34.8 dB | Both channels |
Cable losses are relative to the six-foot Cat6a reference jumper in K2’s December 27, 2024 report. These are test results, not measurements of the installed building cabling.
The test receiver used its maximum attenuation setting to avoid overdriving the RF output on the short optical link. K2’s survey found a stronger, clean off-air signal at 30 Rockefeller Plaza than at Alpine. These findings supported proceeding with the installation and setting receiver levels to suit the actual building signal path.
Equipment procurement and installation
Following the successful test report, K2 purchased the fiber and distribution equipment. The January 2025 procurement records include a Televes 238201 transmitter, four Televes 238101 receivers, Muxlab CATV hubs and shielded baluns, coaxial splitters and equipment shelves. A separate January 30, 2025 purchase order covered 26 Zinwell NextGen TV set-top boxes.
The distribution plan placed the fiber transmitter at the existing 66th-floor fiber shelf, used existing dark fiber and the seventh-floor fiber distribution split, and located optical receivers at second-floor IDF shelves. The receivers restored the RF signals for distribution through the CATV hubs and Cat6a connections to the decoder locations.
K2 installed the fiber equipment at 30 Rockefeller Plaza and adjusted signal levels on site to match the installed distribution path. NBC installed the Zinwell set-top boxes. This division of work connected K2’s transport-system testing and installation with NBC’s deployment of the receiving equipment in the new production facility.
Project outcome
K2 moved the project from a tested signal path to an installed fiber transport system, providing NBC with a measured basis for distributing NextGen TV signals to the new facility. The work combined off-air reception assessment, RF-over-fiber testing, extended Cat6a evaluation, equipment procurement and on-site level adjustment.
Project records: K2 test report and distribution diagram dated December 27, 2024; October and December 2024 proposals; purchase orders 700220, 700226 and 700227. Installation responsibilities reflect the project completion account supplied by K2.