Venture Technologies at Alpine Tower
Venture Technologies Group
Low Power TV Station Installation at Alpine Tower
Alpine, New Jersey | 2019

Custom antenna mount assembly for the east tower leg at 270 feet. TowerKraft Engineering drawing 8420-VENTURE, sheet 2.
Structural engineering, permitting, antenna installation and electrical infrastructure for a new low power television station.
1. PROJECT OVERVIEW
K2 provided the engineering coordination, permitting, antenna and transmission-line installation, and electrical infrastructure for Venture Technologies Group’s low power television station at Alpine Tower. The project supported W28ET-D on RF Channel 28, integrating a new broadcast antenna with the existing tower and preparing the equipment location for the customer’s transmitter installation.
2. THE CHALLENGE
The installation required more than mounting an antenna. The tower needed evaluation for the added load, a custom interface was needed for the existing east leg, and rooftop steel dunnage required analysis for a heat exchanger and 45 kVA transformer. Construction documents and electrical distribution had to address the antenna, transmitter, and cooling equipment as a coordinated installation.
3. STRUCTURAL ENGINEERING AND MOUNT DESIGN
K2’s engineering scope included a structural model run of Alpine Tower with the proposed ERI ALP4L-ESBR-28 antenna, together with analysis of the existing rooftop dunnage for the transformer and heat exchanger. The antenna interface design was developed separately, with shop drawings detailing its connection to the tower.
TowerKraft Engineering’s drawings placed the antenna centerline at 270 feet on the east leg of the 400-foot tower. The mounting assembly used custom inside and outside clamp weldments and a 2½-inch Schedule 40 pipe, 10 feet 6 inches long. Fabrication notes called for steel with a minimum 36 ksi yield strength and hot-dip galvanizing to ASTM A123 or A153. The tower drawing identified TIA-222-G as the design standard.
4. CONSTRUCTION DRAWINGS AND PERMITTING
K2 coordinated an engineering site visit to document existing conditions and proposed equipment locations. The drawing scope included antenna, transmitter, and heat-exchanger construction drawings, an electrical one-line diagram, and signing and sealing by a New Jersey professional engineer, using the customer’s system design as the basis.
K2 also coordinated the permit application. Construction permit 19-099, issued July 29, 2019, authorized building and electrical work at 293 US Route 9W in Alpine, with the work described as “Venture Tech Group Antenna etc.”